Kolk has completely suveyed the project and designed a "tailor" made connection for the existing pipeline. The entire construction is developed by Kolk 3D drawings so that the contractor could determine exactly how the structure had to be realized.

The photos show the total project again in realized between construction. Given the complexity of the installation Kolk has also assisted in the assembly.

The scope of delivery of Kolk consisted of:

  • 90° Flanged bend  (Q)
  • 30° Flanged bend  (FFK)
  • Tensile flanged adaptor
  • Gasket kits